Magnetic Materials
Durable Truss Type Auto Climbing Formwork In Building Construction Suzhou Modern Media Square
Auto-climbing Formwork
Description
?
Durable Truss Type Auto Climbing Formwork In Building Construction Suzhou Modern Media Square
?
Project: Suzhou Modern Media Square(Jiangsu,China)
Contractor: Suzhou 2nd construction Group Co;Ltd
Product Type: Auto-climbing Formwork
?
Introduction
The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best choice for construction of high buildings and towers.
?
?
ZPM-100??Structure?Sketch
?
?
?
The?Characteristics
1?The?system?is?able?to?climb?as?a?whole?or?individually,?and?in?a?stable?way.
2?As?the?system?climbs?by?itself?and?cleaning?work?is?done?in?situ,??tower?crane?lifts?are?greatly?reduced.
3?It’s?safe?and?convenient?to?operate,?and?labor?and?material?costs?will?be?greatly?slashed.?
4?The?bracket?will?not?come?back?to?the?ground?until?the?construction?is?finished.?Field?spacing?will?be?reduced?and
?the?bumping?damages?can?be?almost?prevented,?especially?for?the?panels.
5?The?climbing?process?is?steady,?synchronous?and?safe.
6?All-purpose?platforms?are?provided,?and?there?is?no?need?to?set?up?additional?operation?platforms,?which?means?
saving?the?labor?and?material?costs?again.
7?There?is?little?margin?for?error.?And?if?there?is,?it?is?simple?and?easy?to?correct.?Deviations?of?construction?work?can?
be?eliminated?floor?by?floor.??
8??Fast?climbing?speed?can?be?achieved,?and?the?construction?cycle?will?be?maintained?according?to?schedule.?
?
Modern media square is located in Suzhou industrial field with a total area of about 328000 square meters. Architectural appearance is modern , fashionable and novel, the whole project consist of three layers basement and two ‘L’ buildings over ground. The office tower building has 47 floors, the height is 214.8 meters, we use steel frame structure system for core wall part. We use heavy type steel structure for studio building in the podium building. The hotel tower building has 41 floors, the height is 164.9 meter, we use core wall & strength steel concrete frame. And we use frame structure for commercial building in the podium. Two podium buildings?
Read More
Beijing Zulin Formwork & Scaffolding Company
High Rise & Super High Rise Building Formwork,Building Formwork,Industrial Factory Warehouse Formwork
Address: Juyuan Industry Field No.20, Mapo Town,
Beijing, Beijing
China, 100000
Tel: 86-010-69407048
Fax: 86-010-69409139