Magnetic Materials

Share us

Durable Truss Type Auto Climbing Formwork In Building Construction Suzhou Modern Media Square

Auto-climbing Formwork

Description

?

Durable Truss Type Auto Climbing Formwork In Building Construction Suzhou Modern Media Square

?

Project: Suzhou Modern Media Square(Jiangsu,China)
Contractor: Suzhou 2nd construction Group Co;Ltd
Product Type: Auto-climbing Formwork

?

Introduction

The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best choice for construction of high buildings and towers.

?

?

ZPM-100??Structure?Sketch

?

?

?

The?Characteristics


1?The?system?is?able?to?climb?as?a?whole?or?individually,?and?in?a?stable?way.
2?As?the?system?climbs?by?itself?and?cleaning?work?is?done?in?situ,??tower?crane?lifts?are?greatly?reduced.
3?It’s?safe?and?convenient?to?operate,?and?labor?and?material?costs?will?be?greatly?slashed.?
4?The?bracket?will?not?come?back?to?the?ground?until?the?construction?is?finished.?Field?spacing?will?be?reduced?and

?the?bumping?damages?can?be?almost?prevented,?especially?for?the?panels.
5?The?climbing?process?is?steady,?synchronous?and?safe.
6?All-purpose?platforms?are?provided,?and?there?is?no?need?to?set?up?additional?operation?platforms,?which?means?

saving?the?labor?and?material?costs?again.
7?There?is?little?margin?for?error.?And?if?there?is,?it?is?simple?and?easy?to?correct.?Deviations?of?construction?work?can?

be?eliminated?floor?by?floor.??
8??Fast?climbing?speed?can?be?achieved,?and?the?construction?cycle?will?be?maintained?according?to?schedule.?



?

Modern media square is located in Suzhou industrial field with a total area of about 328000 square meters. Architectural appearance is modern , fashionable and novel, the whole project consist of three layers basement and two ‘L’ buildings over ground. The office tower building has 47 floors, the height is 214.8 meters, we use steel frame structure system for core wall part. We use heavy type steel structure for studio building in the podium building. The hotel tower building has 41 floors, the height is 164.9 meter, we use core wall & strength steel concrete frame. And we use frame structure for commercial building in the podium. Two podium buildings?

cheap prodocuts, china suppliers,

Read More

Previous

Ringlock And Cuplock Scaffolding System For Shoucheng Inernational Business Building A...

Previous

Construction Auto Climbing Hydraulic Formwork System for Western Financial Center...

Beijing Zulin Formwork & Scaffolding Company

High Rise & Super High Rise Building Formwork,Building Formwork,Industrial Factory Warehouse Formwork

Address: Juyuan Industry Field No.20, Mapo Town,
Beijing, Beijing
China, 100000

Tel: 86-010-69407048
Fax: 86-010-69409139

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多